1.17.2013

final review requirements


REQUIREMENTS
I-Diagrams
Site and Program Analysis
Concept Diagrams + Relevant Research
Systems Diagrams
·   [structure and skin] system.
·   [environmental performance] system.
·   [circulation and program] system.

II- Drawings
·   1: 1000 detailed site plan including context and landscape
·   1: 250 detailed ground floor plan including landscape
·   1: 500 detailed plans of all levels
·   1:250 detailed sections (1 longitudinal and 3 transversals)
·   1:250 longitudinal elevations (seaside and cityside)
·   1:50 Wall Section and details
·   General Axonometric
·   Perspectives and Experience images

III- Models

·   1:50 Sectional Model
·   1:250 detailed Building Model
·   1:500 Model to be inserted in the site model
·   All previous models

FORMAT
I- 6 A0 portrait orientation.
II- 1 DVD that incudes:
-All submitted A0 boards of all assignments in jpg (300 dpi) AND in illustrator/photoshop/cad
- all drawings
-Pictures of mid-review, final review and sectional models on a black background


DUE DATE
28 January 2013, 10.30 am sharp. 33 % grade

No comments:

Post a Comment